Assigned by the incomplete vehicle manufacturer and kept by every later stage, alterers included.
Of the hundred specification errors the curriculum is built against, 2 involve this term directly. Ranked by weighted risk index.
Completed-vehicle ratings or labels are not reconciled with physical components
Taught in CVT-103.1 — Constraint stack and rating evidenceOrder-sheet ratings are treated as facts about the completed vehicle
Taught in CVT-101.7 — Classification conflict and evidence labRegulatory, lifecycle & emerging $2,000 – $16,000 per incident, typically caught inspection or enforcement. Process, change & evidence $2,500 – $15,000 per incident, typically caught anywhere downstream. How the hundred were built →
Terms the lessons explicitly contrast with this one. Each pair below exists because a lesson wrote the distinction down, not because two words look alike.
This term appears in 1 of the fourteen Level 100 modules. What the course teaches is which document establishes it, what it does not extend to, and what it costs when someone treats it as something it is not.