Five capability levels, 86 governed modules and 690 lessons. Every module runs eight lessons, bar the electric foundations module, which runs ten. The sequence follows how a commercial truck is actually produced — identify, dimension, weigh, structure, match, verify. Every lesson is designed against a registry of one hundred ranked specification errors, at an assumed blended cost of $13,600 each time one reaches the field. One prevented error covers a five-person team for a full level and leaves $3,850 over.
Everything downstream assumes the vocabulary and evidence discipline this module builds. It is the only genuine prerequisite in the program.
Most experienced practitioners pass the exam and still report that the evidence framework changed how they answer customers. It takes a day.
Individual modules can be taken on their own where a team needs depth in one area rather than a credential.
The program was not designed from a syllabus. It was designed backwards from a registry of the specification failures that actually occur, each one ranked by a weighted risk index combining how often it happens, how broadly it applies, and how bad it is when it does.
Payload omissions, axle distribution, CG assumption, wheel-level capacity
Brakes, tires, electrical, hydraulics, body systems and their interfaces
Route and permit rules, serviceability, zero-emission transition
Gearing, duty cycle, cooling, fuel and DEF placement and capacity
Change orders that never propagate, unreconciled records, unit conventions
Reference points, packaging conflicts, frame section and reinforcement
Every one of the hundred maps to a specific lesson, a named case, and an assessment objective. Nothing is in the curriculum that does not prevent a documented failure, and no documented failure is left without a lesson that addresses it.
Distribution of the top 100 errors across the five levels. Level 100 alone addresses 37 of them — which is why Foundations is the prerequisite rather than an introduction.
Every module in the program is built to the same shape, so a learner who finishes one knows exactly what the next one asks of them.
The same method applies in every market. What changes is the rule set it is applied to — and each market’s rules are authored natively in that market’s own units and categories, never converted from the other.
Classified in pounds and inches. Thresholds evaluated as written in U.S. rule text — GVWR classes, FMVSS vehicle types, FHWA classification, CDL groups.
Levels are not time served. A level is complete when you can produce the output it names and defend it against the evidence — which is why the assessment is a written defense and not a quiz.
Identify, dimension and rate the vehicle.
Everyone takes all of it. No path, no electives, no shortcuts.
Match vehicle systems to the mission that pays for them.
Required. Everyone takes these three before any mission work begins, whichever path follows.
Van, flatbed, refrigerated, urban delivery and highway combination.
Construction, bulk, agriculture and the trucks that work off pavement.
Refuse, street and sewer, and the municipal routes that drive the spec.
Aerials, cranes, service bodies and recovery.
Emergency, passenger and purpose-built vehicles.
The same application discipline where energy, not fuel, is the constraint.
Prove the interacting constraints before anybody signs.
The calculations themselves, taken to the level you can defend in a review.
What the engineering decision costs across the life of the asset.
Battery, high-voltage, charging and software, at the same standard.
Produce and defend a complete specification.
One vehicle, carried the whole way and defended at the end.
The same capstone where the fleet, the depot and the grid all have a vote.
Govern validation, change, reliability and deployment.
Running specification as a capability rather than a task.
Source-bounded studios on what is not settled yet. Elective.
Catch one of the hundred, once, and the whole team’s training is already paid for with money to spare. Catch a second and the program is the cheapest line in the department. The blended figure is an assumption we publish rather than hide — the per-category build-up sits on the pricing page, and you are welcome to substitute your own number.
This is a segment of CVT-103.5 as a learner sees it, followed by the challenge item that closes it. Nothing here is a mock-up of the product. It is the product, with the gate taken off.
Gross vehicle weight rating certifies the vehicle. It does not certify either axle, and nothing in it tells you where the load sits. Two trucks carrying the identical weight, one with the body set 48 inGIVEN forward of the tandem centerline and one with it set 96 inGIVEN forward, put very different loads on the rear suspension while reading the same number on a platform scale.
The chassis is a beam on two supports. Treat the tandem as a single reaction at its centerline, sum the moments about one support and the reaction at the other falls out directly. That is the whole method, and every multi-component weight study later in the course is this calculation applied to more loads at once.
The truck in front of you is 200 lb inside its gross rating and 1,640 lb outside its tandem rating. The axle ratings add up to exactly the GVWR, which is ordinary and which is what makes the plate so convincing. Only one of those two numbers appears on the scale ticket, and it is the one that does not matter.
A tandem-rear straight truck comes back from the body shop for final inspection. The data plate reads 52,000 lb GVWR, 18,000 lb front GAWR and 34,000 lb rear GAWR. Wheelbase is 240 in, front axle to tandem centerline. Bare chassis weighs 9,200 lb on the front and 7,800 lb on the rear. The body and its rated payload come to 34,800 lb, with the combined center of gravity 48 in forward of the tandem centerline. The scale ticket reads 51,800 lb. The customer is in the lobby and wants the keys. What do you tell them, and why?
The truck scales at 51,800 lb against a 52,000 lb GVWR, so it is 200 lb under and it is legal. I would release it today and let the customer know they are close to the limit, so they should keep heavy items loaded toward the front of the body and not add anything else.
Every lesson ends on an item like this one. The grader is given the rubric, the scenario and the learner’s own words, and it reports against each criterion separately rather than returning a mark. Where an item carries a red line, no amount of correct arithmetic earns credit for a learner who releases the vehicle anyway — because in the building this lesson is about, that is the only part anybody will remember.